Time tracking report

Time tracking report

Category

Time and workload

Category

Time and workload

Description

How do original estimate, remaining estimate and time spent compare across several projects?

Overview

The Time Tracking report compares planned and actual work. For every project in the scope it shows three bars: the original estimate, the remaining estimate and the time already spent.

The report uses the standard Jira time tracking fields — Original Estimate, Remaining Estimate and Time Spent. Use it to see where work runs over or under plan and how much is still left across several projects at once.

Default configuration

A new Time Tracking report starts with these settings. You can change any of them.

Setting

Default

Setting

Default

Chart

Bar Chart

Data Table

Not displayed

X Axis

Project

Values

Sum of Original estimate, Sum of Remaining Estimate, Sum of Time Spent

Create the report

In Report Builder, open the Templates tab and type Time tracking in the search field. Click the Time Tracking template.

Templates tab with the Time Tracking template

The report opens on the left and the Configure panel on the right. The report is calculated straight away for the current scope.

Select the scope

Expand Get data and click the Scope field. Pick projects, single issues or saved Jira filters, then click Apply filtering. The counter next to the button shows how many issues match. To type a JQL query instead, click Switch to JQL.

Scope selection with three projects

Include parent issues and Include child issues add the parents or the children of the matching issues to the scope. The Details block above the report shows the resulting scope as JQL, with a link to the matching issues in Jira.

Read the result

Each group of bars is one project. Compare the blue bar (original estimate) with the orange one (time spent) to see how far the work has come against the plan; the green bar shows how much is still estimated to be left.

Time Tracking bar chart for three projects with the Configure panel

Close the Configure panel with × to see the report on its own. Click Edit to open the panel again.

Customize the report

All fields of the report are in Set chart and fields.

Set chart and fields with the default Time Tracking fields
  • X Axis — what the bars are grouped by. A bar chart takes one field here. To group by something else, for example Assignee or Sprint, remove Project with ⊗ and add the new field.

  • Values — the numbers drawn as bars. Add field adds another value; ⊗ removes one.

  • The arrow on a field opens its settings. For a value you can change the name and the Format: pretty (weeks, days, hours and minutes, the default), or a single unit — second, minute, hour, day (Jira workday duration) or day (24h).

  • Drag a field by its handle to change the order.

Show the exact numbers

Bars are good for comparison, but not for reading exact values. Set Data Table to Under the chart to add a table with the same numbers. You can also place it above, left or right of the chart.

Time Tracking bar chart with a data table under the chart

Change the chart type

Click the Chart field in Set chart and fields and choose a chart:

  • Pivot table — vertical or horizontal

  • Simple table (list)

  • Pie Chart and Doughnut Chart

  • Number

  • Bar Chart

Select chart dialog with Bar Chart selected

After switching, check the fields in Set chart and fields again.

Save the report

Changes to a template are not saved until you click Add to My Reports, which saves the configured report as your own.