Overview
Worklog analysis can be used to see the worklogs added by current user during the selected period.
On the Worklog analysis page you can use multiple group options. For example, you can group your worklogs by projects and see how much time you logged on the specific Jira project. You can also group by issue to analyze the time booked on each issue.
To open Worklog analysis please click on the Worklog analysis button in the top right corner.
How to switch between different time frames?
To switch between next and previous timeslots you can use <>
How to display the data for a custom time frame?
To apply any custom time frame, please click on current time frame in the middle.
You will see small calendar pop up with some templates on the left side.
You can use any predefined time frame (today, yesterday, this or last week, this or last month) or apply any custom time frame.
To apply a custome time frame, please click on start day.
After that please click on a date, which you would like to set as the last day of your custome time frame. By hovering you will see highlighted days and how your custom period will look like.
After clicking on the last day, the whole period will be highlighted blue.
Please click outside the pop up to see the data according to the new time frame.
How to change the default group option?
To apply any other group option, please
Click on Group by field
After clicking on it, you wll see current hierarchy of group options with the button + Add a field. Please click on it
Find necessary group option in the dropdown or type group option name in the search field to find it faster
Choose an option by clicking on it
You can drag and drop an option to order the list according to your needs
Click outside the pop up to close it and see the statistics.
Please note, it is note possible to add more than 5 grouping levels. + Add a field button will disppear after adding the 5th group option.
How to export the data?
To export the table, please click on export icon in the top right corner and choose necessary export format.
After that file will be downloaded to a local path.
How to see additional worklog details?
Some group options sum time and show total spent per day. For example, if you apply following group option: Worklog author - Project, it will sum worklogs added to the same day to the same project. To see worklogs, you can click on respective cell.
You will sethe window with the list of worklogs added to this day to this project.
If you would need any additional details, you can open the respective ticket by clicking on issue link in the Issue column.
Additional table settings
You can switch between multiple time tracking formats or sum subtasks by selecting respective checkbox in the gear icon options, available in the top right corner.